India's first planned greenfield smart city spanning 920 km² with 567.39 km² designated for development — a world-class hub for residential, industrial, and commercial growth along the DMIC corridor.
A future-ready smart city combining strategic geography with strong governance frameworks to drive industrial growth and innovation.
Economic Corridor Hub
Located near Ahmedabad, Bhavnagar, and Vadodara, Dholera SIR benefits from proximity to GIFT City and PCPIR. Seamless connectivity via DMIC, expressways, and upcoming metro enhances logistics efficiency.
Self-Governed Region
A robust governance ecosystem supporting PPP models like BOT & BOOT, backed by single-window clearance and transparent policy frameworks ensuring investor confidence.

The contractor's scope involves the design, procurement, construction, installation, testing, and commissioning of the ABCD building in Dholera.

The scope includes clearing, grubbing, removal of unsuitable material, and soil filling on Plot A (70 Ha) and Plot B (92 Ha).

The contractor will design, construct, install, test, commission, and maintain a 10 MLD Raw Water Pumping Station and Main.

Establishing a state-of-the-art Experience Zone featuring a physical model, projection mapping, and digital wall content on the ground floor of the BEC, DSIR, Dholera.

The scope includes design and construction of roads, utilities, water supply networks, sewage, drainage, power supply, bridges, and branding elements.

Phase-I works for flood protection along the Adhiya River between SH-06 and Khun village.

Construction of Canal Front Development, including land filling, civil work, MEP services, in the Dholera Special Investment Region.

Design, procurement, and construction of 17 service areas (with porta cabins), along with operation and maintenance.

The contractor will design, procure, construct, install, test, commission, and maintain 14 effluent pumping stations, CETP, pipelines, and reservoirs.

The contractor's scope includes design, procurement, construction, installation, testing, commissioning, 3-month trial run, and 5-year O&M.

The contractor's scope includes design review, balance designs, procurement, construction, installation, testing, commissioning, 2-month trial, and 5-year O&M.

Interior fit-out works for the Business and Exhibition Centre (BEC) building in the ABCD Complex, DSIR.

Design, supply, install, test, integrate, commission, and provide operation and maintenance of ICT components in Cluster A1, Dholera.

Interior works of the Special Purpose Vehicle (SPV) building at ABCD Complex in DSIR, including design, construction, and finishing.
Prime investment destinations within Dholera SIR – driving India's economic transformation
India's first greenfield smart industrial city — planned advantages and real‑time infrastructure progress.
Self-governed region with autonomy for fast, transparent and efficient decision making.
Operational and regulatory flexibility to adapt to business and investor needs.
Hassle-free approvals and clearances through a single-window system.
Located within Gujarat’s industrial corridor enabling strong economic and business linkages.
Proposed metro rail link to Ahmedabad for seamless and sustainable urban access.
Well-connected to the upcoming international airport and planned seaport for global connectivity.
Planned world-class civic amenities and smart city infrastructure for a high quality of life.
Infrastructure and development through PPP models using BOT, BOOT and other frameworks.
Fast-track and transparent dispute resolution for ease of doing business.
Strong focus on private investment and public-private partnerships to drive growth and innovation.
Major arterial roads and trunk infrastructure partially completed.
Land development and zoning work in progress across industrial zones.
Construction of Dholera International Airport is in progress (Phase 1).
Metro rail connectivity to Ahmedabad is approved and in planning stage.
Bulk water supply and distribution network under development.
Power substations and distribution network work in progress.
Industrial activity and investments are in early development stage.
Dholera SIR is a mega project under active development. Many infrastructures are planned and in various stages of implementation.
Progress may change over time. Please refer to official government sources for the latest updates.